SEASON 45, PRE-RACE 3
Testing stints data (laps done: 90/100, stints done: 3/10)
# Laps done Lap time Settings End of stint
Best Mean FW RW Eng Bra Gear Susp Tyres Fuel Tyres cond Fuel left Comm
1 30/34 1:54.183s 1:55.253s 590 490 745 565 486 919 Hard 140 0% 20
2 30/33 1:53.990s 1:55.002s 590 490 745 565 486 919 Hard 131 0% 11
3 30/33 1:54.051s 1:55.063s 590 490 745 565 486 919 Hard 131 0% 10
1 top speed
2 hairpins
3 cornering
part /level /pre% /post% /diff / cost
CH - 6 - 18% - 27% - 9% - $338,974
EN - 6 - 12% - 27% - 15% - $1,447,529
FW - 5 - 29% - 41% - 12% - $438,002
RW - 5 - 33% - 45% - 12% - $424,668
UN - 6 - 22% - 31% - 9% - $133,783
SP - 6 - 16% - 25% - 9% - $120,593
CO - 6 - 23% - 32% - 9% - $119,206
GB - 6 - 28% - 40% - 12% - $1,083,321
BR - 6 - 32% - 47% - 15% - $304,947
SU - 6 - 23% - 29% - 6% - $206,577
EL - 7 - 17% - 23% - 6% - $203,200
TOTAL COST FOR TESTING SESSION (Testing cost +(each part level cost x %)): $5,820,799
came into this session with car character points already at 6/6/6
Points type ....... P ......... H ........ A
Test pnts ........23.6 ..... 23.6 ..... 23.6
R&D pnts ........21.5 ..... 21.5 ...... 21.5 <<became these numbers
Engineer pnts .. 17.1 ..... 17.1 ...... 17.1 <<became these numbers
Car char pnts ...... 2 ......... 3 ......... 2 <<became these numbers
Base pnts .......... 5 ......... 5 ......... 6 <<added to these numbers
Tot char pnts ...... 7 ......... 8 ......... 8 <<became these numbers
Testing stints data (laps done: 90/100, stints done: 3/10)
# Laps done Lap time Settings End of stint
Best Mean FW RW Eng Bra Gear Susp Tyres Fuel Tyres cond Fuel left Comm
1 30/34 1:54.183s 1:55.253s 590 490 745 565 486 919 Hard 140 0% 20
2 30/33 1:53.990s 1:55.002s 590 490 745 565 486 919 Hard 131 0% 11
3 30/33 1:54.051s 1:55.063s 590 490 745 565 486 919 Hard 131 0% 10
1 top speed
2 hairpins
3 cornering
part /level /pre% /post% /diff / cost
CH - 6 - 18% - 27% - 9% - $338,974
EN - 6 - 12% - 27% - 15% - $1,447,529
FW - 5 - 29% - 41% - 12% - $438,002
RW - 5 - 33% - 45% - 12% - $424,668
UN - 6 - 22% - 31% - 9% - $133,783
SP - 6 - 16% - 25% - 9% - $120,593
CO - 6 - 23% - 32% - 9% - $119,206
GB - 6 - 28% - 40% - 12% - $1,083,321
BR - 6 - 32% - 47% - 15% - $304,947
SU - 6 - 23% - 29% - 6% - $206,577
EL - 7 - 17% - 23% - 6% - $203,200
TOTAL COST FOR TESTING SESSION (Testing cost +(each part level cost x %)): $5,820,799
came into this session with car character points already at 6/6/6
Points type ....... P ......... H ........ A
Test pnts ........23.6 ..... 23.6 ..... 23.6
R&D pnts ........21.5 ..... 21.5 ...... 21.5 <<became these numbers
Engineer pnts .. 17.1 ..... 17.1 ...... 17.1 <<became these numbers
Car char pnts ...... 2 ......... 3 ......... 2 <<became these numbers
Base pnts .......... 5 ......... 5 ......... 6 <<added to these numbers
Tot char pnts ...... 7 ......... 8 ......... 8 <<became these numbers
Last edited by rick queary on Mon Jan 05, 2015 3:16 pm; edited 1 time in total